Dimensions
| Operating area width | 300 mm |
| Standard yokes for minimal workpiece bore diameter | 115 mm |
| Optional yokes for minimal workpiece bore diameter | 60, 80 mm |
| Dimensions (W x L x H) | 400 x 743 x 550 mm |
Performance
| Heating performance example (bearing, weight, temperature, time) | 24188ECA/W33, 450 kg, 110 °C, 28 min |
Properties
| Recommended applications |
Fans and blowers
Compressors
Roller conveyors
Bearing houses
Gear boxes
Electrical motors
Pump installations
Engines
|
| Type | Induction heater, workshop floor |
| Series | TIH L33 |
| Heating method | Induction, low frequency |
| Suitable for mounting | Yes |
| Suitable for dismounting | No |
| Solid workpiece weight (max, mounting) | 700 kg |
| Bearing weight (max) | 700 kg |
| Workpiece bore diameter (mounting) | 60 – 700 mm |
| Workpiece outer diameter | 78 – 1300 mm |
| Power consumption (max) | 15 kVA |
| Workpiece width (max) | 300 mm |
| Workpiece cross section height (max) | 320 mm |
| Operating area height | 320 mm |
| Coil diameter | 150 mm |
| Main yoke type | Sliding yoke, 80 x 80 mm |
| Yoke storage | No |
| Voltage | 200-240 V |
| Voltage frequency | 50 / 60 Hz |
| Current (max) | 63 A |
| Temperature measurement | Magnetic probe K-type |
| Number of temperature sensors | 1 |
| Demagnetisation after heating | Yes |
| Error guiding codes | Yes |
| Thermal overload protection | Yes |
| Bearing support arms | Yes, removeable |
| Display | 7 segment LED display |
| Forced air cooling | No |
| Power setting | 50%, 100% |
| Thermometer mode | Yes |
| Time mode | Yes |
| Remote control panel (wired) | Yes, with LED display |
| Heating time control | 0 – 3600 s |
| Heating time steps | 6 s |
| Heating temperature control | 20 – 250 °C |
| Heating temperature steps | 1 °C |
| Housing material |
Steel
Glass fibre filled polyamide
|
| Colour |
Grey
Black
|
| Content | Heater, Remote control, Temperature probe (TIH P20), 2 standard yokes (TIH 220-Y67, TIH 220-Y10), 1 pair of heat resistant gloves (TMBA G11) and 1 tube of anti fretting paste (LAGF 3E/0.035) |
Shipping & Delivery
Transparent Pricing, No Hidden Fees. At [YOKUYOPA], we are committed to delivering your order as efficiently as possible. To ensure a seamless experience, we utilize a “Delivered Duty Paid” (DDP) model. This means the price you see at checkout includes all shipping costs, import duties, and local taxes. No surprise bills upon delivery—guaranteed.
Shipping Methods
We optimize our shipping strategy based on product specifications to balance speed and cost-effectiveness:
-
Standard Air Freight (Small & Lightweight Items)
-
Best for: Gadgets, accessories, and small parcels.
-
Timeline: Delivered within 7–12 business days.
-
Cost: FREE on all standard items.
-
-
Sea Freight + Local Trucking (Large & Heavy Items)
-
Best for: Furniture, machinery, and bulky goods.
-
Timeline: 25–45 business days depending on your location.
-
Cost: FREE door-to-door delivery.
-
Note: For heavy items, our logistics partners will contact you to schedule a convenient delivery window once the shipment clears local customs.
-
-
Expedited Express (Priority Upgrade)
-
Timeline: 3–7 business days via DHL, FedEx, or UPS.
-
Cost: Calculated at checkout based on weight and destination.
-
Order Tracking
Once your order is dispatched, you will receive a confirmation email with a tracking number. For Sea Freight, tracking typically updates after the vessel arrives at the destination port and passes customs inspection.
🔹 Have a custom product in mind? Send your ideas to sales@yokuyopa.com before ordering!




